— Project portfolio

Selected projects & deliverables.

Each project below links to its full drawing set inside our portfolio — zoom in to read every dimension and bar mark.

Green Mashaar – Phase Two

Project P01 · Landscape & infrastructure

Green Mashaar – Phase Two

Landscaping Project – Zone F

Location
KSA
Owner
KIDANA
PMC
Parsons
Supervision
EHAF Consulting Engineers
Contract
CC122.2
Status
For As-Built
  • —Structural shop drawings – water tanks F1, F2, F3 (concrete dimensions & reinforcement)
  • —Tree layout – Zone F (master layout + 3 parts)
  • —Irrigation network – Zone F (master layout + 4 parts)
  • —5D quantity schedules – Zone F (mechanical & electrical)
BIM modelingShop drawings5D quantities
View drawing set → 44 sheets
Electrical Panels Replacement – Block 28A

Project P02 · MEP – electrical infrastructure

Electrical Panels Replacement – Block 28A

Main & Secondary Tents – Plot 28A

Location
KSA
Owner
KIDANA
PMC
Parsons
Supervision
Euro Consult
Contractor
ABN – Azzam Al-Shareef Co.
Contract
CC113.01
  • —3D cover sheet and LV cable layout
  • —Power, lighting and earthing cable layouts
  • —Panel schedules and layouts
  • —5D quantity schedule – Plot 28A
MEP BIMCable routing5D quantities
View drawing set → 11 sheets
Masjid Nimra – Thermal Impact Reduction

Project P03 · Religious / public facility – structural

Masjid Nimra – Thermal Impact Reduction

Tank Type 2 – Structural As-Built Reinforcement

Location
Arafat, Makkah, KSA
Drawing set
NAMIRA-DWG-A.B-CV-05
Revision
00 – First Submittal
Date
20-04-2025
  • —Raft: bottom, top and additional reinforcement, and sump detail
  • —Wall sections, starter, horizontal and full-height vertical bars
  • —Roof: bottom, top and additional reinforcement
  • —Opening reinforcement details
Structural as-builtReinforcement detailing
View drawing set → 21 sheets
Saadiyat Lagoons – Package 4, Cluster 2B

Project P04 · Residential villas & infrastructure

Saadiyat Lagoons – Package 4, Cluster 2B

Group G08 – Villas & Infrastructure

Location
Saadiyat Island, Abu Dhabi, UAE
Client
Aldar
PMC
HILL International
Lead consultant
KEO International
Infra. consultant
Parsons
Main contractor
Trojan ACC
  • —Substructure general arrangement – boundary wall & driver room (Villas 148–153, 231)
  • —Substructure sections and waterproofing build-up – Pod Villa 231
Structural coordinationShop drawings
View drawing set → 4 sheets
ALMA – New Alamein City

Project P05 · Building structure

ALMA – New Alamein City

Columns Reinforcement Details

Location
New Alamein City, Egypt
Structural consultant
E.C.O. – Dr. Ali AbdelRahman
Drawing set
ALMA-STR-SD-COL-RFT
Date
23/6/2024
Sheet size
A0
  • —Column reinforcement shop drawings (Details 01–04 + supplementary sheet)
Structural shop drawingsReinforcement detailing
View drawing set → 5 sheets
New Degla – Tora (Block B5)

Project P06 · Residential building – foundations

New Degla – Tora (Block B5)

Foundation Details

Location
Tora, Egypt
Owner
Wadi Degla Real Estate
Contractor
M.A.M Construction
Project no.
EG 05-16
Date
1/11/2023
  • —Foundation details – Block B5, sheets 501 to 507
Structural shop drawingsReinforcement detailing
View drawing set → 7 sheets
Slab Reinforcement Detailing

Project P07 · Building structure – slab

Slab Reinforcement Detailing

First Floor Slab – Phase 01

Location
—
Sheet
SD – First Slab
Plot date
05/10/2024
  • —First floor slab mesh reinforcement – bottom X-X and top Y
Structural shop drawings
View drawing set → 1 sheets